Snowline gold drills 617.6 m at 1.7 grams per tonne gold from surface, including 3.24 grams per tonne gold over 202.0 m, showcasing strong consistency of valley deposit, rogue project, yukon

Key infill holes deliver: hole v-24-119 intersects 617.6 m at 1.68 g/t au from bedrock surface at 2.4 m downhole, including 202.0 m at 3.24 g/t au, highlighting along with other holes consistency of strong, near-surface mineralization across largest gaps in previous drilling updated mineral resource estimate forthcoming: valley mre to be updated in first half of 2025, following a 90% increase in total drilling (53 km vs 28 km in 2024) rapid project advancement: work underway on first-ever preliminary economic assessment for valley deposit, set to highlight potential economics of large, low strip, front-heavy gold system. vancouver, bc / access newswire / march 4, 2025 / snowline gold corp (tsxv:sgd)(otcqb:snwgf) (the "company" or "snowline") is pleased to announce additional drill results from its 2024 drill campaign on the valley deposit, rogue project, yukon.
sgd Ratings Summary
sgd Quant Ranking