New pacific intersects 535 m interval grading 1.0 gram per tonne gold, and 58 m interval grading 507 gram per tonne silver at the carangas project

Vancouver, bc , july 13, 2022 /prnewswire/ - new pacific metals corp. ("new pacific" or the "company") (tsx: nuag) (nyse: newp), together with its local bolivian partner, announce the assay results of the first five drill holes of the 2022 drill program at the carangas silver-gold project, oruro department, bolivia (the "carangas project" or the "project"). results are summarized in table 1 and the drill specifications are provided in table 2 (see also figure 1).
NEWP Ratings Summary
NEWP Quant Ranking