Integra announces oxide drill results: 0.74 g/t aueq over 76 m and 0.49 g/t aueq over 53 m at florida mountain, 0.57 g/t aueq over 50 m at delamar, demonstrating continued success of the stockpile drill program

Vancouver, british columbia, march 30, 2023 (globe newswire) -- integra resources corp. (“integra” or the “company”) (tsx-v: itr; nyse american: itrg) is pleased to announce an additional set of drill results from the 11,000 m stockpile drill program underway at the delamar project (“delamar” or the “project”) located in southwestern idaho. the drill results announced today are from 20 additional drill holes representing 825 m from the 11,000 m stockpile drill program. in total, the company has drilled 10,164 m in 262 drill holes as part of stockpile drill program. with each new set of drill results, the company's confidence that this material, a portion of which was included as a pre-stripping cost in the company's 2022 pre-feasibility study (“pfs”), has the potential to increase the heap leach mine life and further enhance the robust economics presented in the pfs.
ITRG Ratings Summary
ITRG Quant Ranking