Integra announces oxide drill results: 0.59 g/t gold equivalent over 111 m and 0.67 g/t gold equivalent over 50 m from delamar stockpile drill program, 0.54 g/t gold equivalent over 55 m in first florida mountain backfill drill result

Vancouver, british columbia, march 14, 2023 (globe newswire) -- integra resources corp. (“integra” or the “company”) (tsx-v: itr; nyse american: itrg) is pleased to announce additional drill results from the delamar project (“delamar” or the “project”) located in southwestern idaho. the drill results announced today are from 20 additional drill holes representing 984.5 m from the north delamar backfill, stockpile 1, stockpile 2 and the first assays from florida mountain's jacobs gulch and tip top backfill. the drill program and the assay results reported to date have exceeded the company's expectations and continue to demonstrate the potential for this material to extend the heap leach mine life at delamar and further enhance the project economics. the estimated 60 mt of previously blasted and mined material that has been stockpiled and/or used as backfill at delamar and florida mountain has consistently returned grades that far exceed the cut-off grade for the proposed heap leach operation outlined in the company's 2022 pre-feasibility study (“pfs”).
ITRG Ratings Summary
ITRG Quant Ranking