Allied critical metals announces highlights from the 2023-24 borralha drill program

Highlights from 2023-24 drill program* include: from bo_rc_12: 5.79% wo₃ over 2.0 metres (182-184m) 1.12% wo₃ over 4.0 metres (246-250m, within 12m from 82m to 94m of 0.40%) 0.78% wo₃ over 12.0 metres (82-94m, within 20m from 82m to 102m of 0.50%) 0.50% wo₃ over 20.0 metres (82-102m) from bo_rc_11: 1.75% wo₃ over 10.0 metres (140-150m, within 38m from 112m to 150m of 0.56%) 0.56% wo₃ over 38.0 metres (112-150m) from bo_rc_13: 0.68% wo₃ over 2.0 metres (208-210m) from bo_rc_02: 0.63% wo₃ over 16.0 metres (62-78m, within 108m from 26m to 134m of 0.22%) from bo_met_01: 0.60% wo₃ over 5.0 metres (60-65m, within 106m from 60m to 166m of 0.21%) 0.21% wo 3 over 106.0 metres (60-166m) from bo_met_02a: 0.53% wo₃ over 23.0 metres (62-85m) *as previously reported in the borralha technical report (see below). vancouver, british columbia--(newsfile corp. - september 23, 2025) - allied critical metals inc. (cse: acm) (otcqb: acmif) (fse: 0vj0) ("allied" or the "company"), which is focused on its 100% owned past producing borralha and vila verde tungsten projects in northern portugal, is pleased to announce highlights from its 2023 & 2024 drill program on its 100% owned borralha tungsten project.
ACM Ratings Summary
ACM Quant Ranking